| Age | Commit message (Collapse) | Author | Files | Lines | |
|---|---|---|---|---|---|
| 10 days | docs(plan): controls panel implementation plan | Danilo M. | 1 | -0/+1063 | |
| Nine tasks: two spec corrections found while planning, the pure helpers with their node test, the preferences singleton, the tile, the panel, the island and IPC wiring, the SUPER release bind with its fallback, a visual pass with the user, and docs. The plan's test was run against the plan's Controls.js before committing. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> | |||||
