summaryrefslogtreecommitdiffstats
path: root/docs
AgeCommit message (Expand)AuthorFilesLines
12 hoursdocs: scrub account names from comments, tests and fixturesDanilo M.2-5/+5
12 hoursfeat(sync): dismissable log pane, progress bar, and a skip that is not a failureDanilo M.1-0/+68
12 hoursfeat(tags): add an Edit tags dialog on Ctrl+TDanilo M.1-1/+33
12 hoursdocs: add item 26, no way to tag from the UIDanilo M.1-0/+43
12 hoursdocs: add items 24 and 25 from the user's notesDanilo M.1-0/+60
12 hoursfeat(sync): show unsynced edits and offer to sync on exitDanilo M.1-2/+53
12 hoursdocs: add items 21-23 and refine item 5 from the user's notesDanilo M.1-0/+109
12 hoursfeat(threads): mark an opened thread read after a delayDanilo M.1-2/+46
12 hoursfeat(message): show From/To/Cc and add a details dialogDanilo M.1-1/+32
12 hoursdocs: record the item 2 decision, postpone 10, add items 18-20Danilo M.1-4/+178
12 hoursdocs: document query completion config and shortcutDanilo M.1-1/+1
12 hoursdocs: add the query completion implementation planDanilo M.2-3/+1658
12 hoursdocs: make the mimetype completion list user-extensibleDanilo M.1-3/+44
12 hoursdocs: spec query bar completion, require translatable stringsDanilo M.1-0/+240
12 hoursbuild: add a SlackBuild under assets/slackbuildDanilo M.1-1/+1
12 hoursfeat: make attachments reachable from the message paneDanilo M.1-1/+47
12 hoursdocs: add backlog items 15 to 17 from usage notesDanilo M.1-0/+103
12 hoursfeat: choose the startup query by nameDanilo M.1-0/+15
12 hoursfeat: own the message-pane zoom and persist itDanilo M.1-1/+33
12 hoursfeat: persist window, splitter and column widthsDanilo M.1-1/+19
12 hoursfeat: use the application iconDanilo M.1-1/+39
12 hoursfeat: show that a tag action landedDanilo M.1-0/+38
12 hoursfeat: add menus, a toolbar and a shortcut referenceDanilo M.1-3/+32
12 hoursdocs: add post-0.1.0 usability backlog and app iconDanilo M.1-0/+349
12 hoursdocs: remove personal details from the verification recordDanilo M.3-20/+21
12 hoursdocs: add README, changelog and release procedurev0.1.0Danilo M.1-0/+83
12 hoursdocs: record manual verification items 16-20Danilo M.1-15/+66
12 hoursdocs: record item 15 and summarise the manual passDanilo M.1-4/+41
12 hoursdocs: correct the commit hash for the keyboard fixDanilo M.1-1/+1
12 hoursdocs: record item 12 and item 14 with the keyboard fixDanilo M.1-2/+31
12 hoursdocs: record manual verification items 4, 6-11Danilo M.1-6/+96
12 hoursfix: render the message pane at allDanilo M.1-1/+11
12 hoursdocs: record manual verification resultsDanilo M.1-0/+124
12 hoursdocs: fold deferred findings into the task 13 checklistDanilo M.1-5/+23
12 hoursfeat: add MailSync process wrapperDanilo M.2-6/+6
12 hoursdocs: unit-test NotmuchWorker against a throwaway databaseDanilo M.2-6/+22
12 hoursdocs: scope the document-load exemption to an exact URLDanilo M.2-3/+31
12 hoursfix: make attachment path-containment guard separator-awareDanilo M.1-5/+20
12 hoursfeat: add Config with account, query, and sync parsingDanilo M.2-8/+8
12 hoursdocs: fold full thread rendering and batch tagging into spec and planDanilo M.2-89/+541
12 hoursdocs: add qtmaildir v1 implementation planDanilo M.1-0/+3988
12 hoursdocs: add qtmaildir v1 design specDanilo M.1-0/+430